The NYCT Construction of Substations at Clifton and New Dorp in Staten Island project includes fabricating and installing two pre-engineered power substations at two separate stations, Clifton and New Dorp, within the Staten Island Railroad System (SIRTOA).

Project Details​

  • Contract Value: $40M

  • Completion Date: Ongoing

  • Location: Staten Island, NY

  • Scope of Work:

    • Fabricate and install two pre-engineered power substations at two separate stations (Clifton and New Dorp), within the Staten Island Railroad System (SIRTOA)

    • New electrical services for each location, bringing ConEd high-tension and low-tension services to these substations, consisting of new underground electrical duct banks and manholes

    • New positive and negative traction power cables were installed to power the third rail systems  

    • Signal system integration and communication system upgrades

TAP Electrical Contracting Service, Inc.
631-567-7600 • info@tapelectric.net

New York City Office | 22-26 129th Street, College Point NY 11356

Long Island Office | 1770 Motor Parkway, Islandia NY 11749

Copyright © 2024 TAP Electrical Contracting Service, Inc.
Equal Opportunity Employer

 

NYC Licensed Electrician Firm No. 001410

Jeffrey R. Cardillo | Licensed Electrical Contractor No. 12756

 

Employee Webmail

  • LinkedIn
bottom of page